By reducing overhead dimension, projection of middle/low-height buildings can be reduced.
●
Overhead reduction provides easier construction of the roof. While clearing the sun-shadow restriction and north diagonal line restriction, OUG can be located at the northern edge of the building which contributes to effective use of the space.
Control panel
●
Control panel installed at the side of bottom floor in hoistway.
●
Adoption of slim-type control panel.
Reduction of pit depth
●
Pit depth dimension reduced by 200 mm* (in case of speed 90 m/min and 150 m/min, at applicable EN Code) by application of compact equipment.
●
Pit depth reduction provides easier construction.
*
Comparison of old model "OUX"
New Slim-type traction machine
●
Application of new gearless machine and PM (permanent magnet) motor.
●
Double brake type.
●
Traction machine installed on the side of bottom floor in hoistway.
●
Machine will not drop due to earth-quake or other accident.