Hitachi supports minimum outage duration and stabilizes voltage with mass PV connection
| Primary function | ||
|---|---|---|
| Automatic power restoration | Voltage stabilization control | Loss minimization calculation |
| Network state estimation | Optimal feeder configuration determination | |
Power restoration for the affected area within just a few minutes after the power failure

Annual Interruption duration per user in Japan is the shortest in the world

DMS:Distribution Management System
EMS:Energy Management System
GIS:Geographic Information System
PV:Photovoltaic
SVC:Static Var Compensator
SVR:Step Voltage Regulator
LRT:Load Ratio Control Transformer
LDC:Load Drop Compensator
FTU:Field Terminal Unit
RTU:Remote Terminal Unit
GPS:Global Positioning System
FEP:Front End Processor
FCB:Feeder Circuit Breaker